Header: Header: Header:

Vaagen Bros. Lumber Installs Gilbert Planer 

Vaagen Bros. Lumber in Colville, Wash. installed a Gilbert high-speed planer featuring the Gilbert Roll Intelligent Positioning (GRIP) system, feed decks, feed table and slowdown belts. The mill will be running lumber up to 12 in. wide, and 20 ft. length.

With the Pull-Through technology from Gilbert, there’s no need for a bridge between the infeed table and the planer. This enables a more compact layout by placing the planer directly next to the lumber line. As a result, a longer outfeed section can be added, allowing more boards to be processed per minute. Additionally, the extra space accommodates a second slowdown belt to decelerate the boards more effectively.

To help increase feeding at high speeds, Vaagen opted for the GRIP system. Available on all Gilbert planer models, the GRIP allows for precise top roll movement, maintaining perfect contact with boards without causing damage. This optimizes the flow of lumber and increases piece count.

Latest News

Mellott Manufacturing Log Flare Butt Reducer

By customer request Mellott Manufacturing Co., Inc. is now offering the model 70E log flare butt reducer—designed and built with the same rugged quality as the LMR debarkers and all the Mellott product lines. Adding a log flare butt reducer to a mill infeed system will vastly reduce log handling problems…

Wood Fiber Group Merges With USNR

USNR and Wood Fiber Group have announced their merger. USNR is an industry-leading global supplier of sawmill and plywood mill machinery, aftermarket parts, and technical and engineering services. Wood Fiber Group is the largest supplier of cutting tools and filing room equipment to the wood products…

Industry Patriarch Varn Passes

George W. Varn, Sr., who broke into the family turpentine business following World War II, and then along with a cousin built a chip mill and a sawmill in the late 1960s in Hoboken, Ga., called Varn Wood Products, and who became one of the patriarchs of the southern pine lumber industry, died September 4 in St. Vincent’s Hospital in Jacksonville, Fla., the same hospital…

GP To Build New Sawmill At Pineland

Georgia-Pacific plans to invest $120 million and build a new sawmill at its existing sawmill site in Pineland, Tex. Construction is expected to begin early next year and completed in late 2022. The new sawmill will replace the existing stud mill that was built in the 1960s. The new mill will have the ability to produce 450MMBF of…

Find Us On Social

Newsletter

The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.

 

Subscribe/Renew

Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.