Header: Header: Header:

Vaagen Bros. Lumber Installs Gilbert Planer 

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548381510056-0'); });

Vaagen Bros. Lumber in Colville, Wash. installed a Gilbert high-speed planer featuring the Gilbert Roll Intelligent Positioning (GRIP) system, feed decks, feed table and slowdown belts. The mill will be running lumber up to 12 in. wide, and 20 ft. length.

With the Pull-Through technology from Gilbert, there’s no need for a bridge between the infeed table and the planer. This enables a more compact layout by placing the planer directly next to the lumber line. As a result, a longer outfeed section can be added, allowing more boards to be processed per minute. Additionally, the extra space accommodates a second slowdown belt to decelerate the boards more effectively.

To help increase feeding at high speeds, Vaagen opted for the GRIP system. Available on all Gilbert planer models, the GRIP allows for precise top roll movement, maintaining perfect contact with boards without causing damage. This optimizes the flow of lumber and increases piece count.

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548381461985-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548381402298-0'); });

Latest News

Stimpson Retires After Active Career

Fred Stimpson, one of the Stimpson family members who ran Gulf Lumber Co. in Mobile, and who was most recently president of Canfor Southern Pine for six years, announced his retirement this past December. In…

Satellite Pellet Mills Will Count On Sawmill Byproducts

Drax Group will begin constructing the first of three new “satellite” pellet plants in Arkansas, the company has announced. The three plants are together expected to produce around 120,000 metric tons of sustainable biomass pellets…

Microtec Announces Branding Strategy

Microtec, a global leader of scanning and optimization solutions for the sawmilling and wood processing industry, announced the official integration and inclusion of FinScan and WoodEye within the Microtec family. From now on the two…

Alabama Mill Plans To Build Back

Thankfully no injuries were reported after an air compressor exploded and started a fire at East Alabama Lumber’s sawmill at Lafayette, Ala. on April 22, 2021. The fire took out most of the sawmill in…

Find Us On Social

googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548381237439-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380448760-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380578329-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380709898-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380656716-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380767732-0'); });
googletag.cmd.push(function() { googletag.display('div-gpt-ad-1548380810300-0'); });
Newsletter

The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.

 

Subscribe/Renew

Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.

Advertise

Complete the online form so we can direct you to the appropriate Sales Representative.