Vaagen Bros. Lumber Installs Gilbert Planer
Vaagen Bros. Lumber in Colville, Wash. installed a Gilbert high-speed planer featuring the Gilbert Roll Intelligent Positioning (GRIP) system, feed decks, feed table and slowdown belts. The mill will be running lumber up to 12 in. wide, and 20 ft. length.
With the Pull-Through technology from Gilbert, there’s no need for a bridge between the infeed table and the planer. This enables a more compact layout by placing the planer directly next to the lumber line. As a result, a longer outfeed section can be added, allowing more boards to be processed per minute. Additionally, the extra space accommodates a second slowdown belt to decelerate the boards more effectively.
To help increase feeding at high speeds, Vaagen opted for the GRIP system. Available on all Gilbert planer models, the GRIP allows for precise top roll movement, maintaining perfect contact with boards without causing damage. This optimizes the flow of lumber and increases piece count.
Latest News
Valutec TC Kilns See North American Success
As a leading developer and world leader in continuous dry kilns Valutec has delivered more than 2,000 continuous kilns to sawmills around the world. In 2020, the company commissioned North America’s first TC continuous kiln at Pleasant River’s Moose River Lumber in Jackman, Me. Now, another eight kilns are up and running, or being installed in North America…
SmartLam Plans Glulam Facility
SmartLam North America, reportedly the largest manufacturer in North America of cross-laminated timber (CLT), announced it will build a $50 million glulam manufacturing facility in Dothan, Ala. The new SmartLam facility, to be built adjacent SmartLam’s existing CLT facility in a 144,000 sq. ft. structure, will manufacture…
Peak Announce SYP Pellet Mill
Vancouver, Canada-based Peak Renewables plans to build a 180,000 metric tons per year wood pellet mill in Dothan, Ala. The $30 million project will utilize residuals from Rex Lumber sawmills in the area. Construction on the facility is expected to be completed by mid-2023. Peak is building the plant adjacent the SmartLam cross-laminated timber plant and upcoming glulam facility in Dothan…
U.S. Housing Starts Dip In September, Both Single-Family & Multi-Family Soften
U.S. housing starts dropped 8.1% in September from August to a seasonally adjusted annual rate of 1.439 million, including a drop in single-family starts of 4.7% to 892,000 and a decline in multi-family starts of 13.1% to 530,000, according to the U.S. Census Bureau and U.S. Dept. of Housing and Urban Development monthly new residential construction report…
Find Us On Social
Newsletter
The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.
Subscribe/Renew
Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.