Auburn, U.S. Air Force Developing Mass Timber Military Housing Prototypes
Auburn University engineers are working with the U.S. Air Force to redesign deployable military housing using mass timber, with the goal of creating temporary barracks-style structures that can be assembled faster and perform better in cold-weather environments.
Led by Auburn Engineering, the project combines structural design, materials testing and prototype development with architecture and building science expertise from Auburn’s College of Architecture, Design and Construction. Battelle is partnering with the Air Force to build prototypes.
David Roueche, the Gottlieb Associate Professor in the Department of Civil and Environmental Engineering says the Air Force needs temporary housing that can be transported, assembled and occupied quickly. Mass timber gives the team a way to meet that need by shifting more work into prefabrication, reducing on-site assembly time and improving thermal performance for cold-weather deployments.
Existing light wood-frame versions can require four or five people working eight- to 10-hour days over four or five days to build one structure—roughly 160 to 200 person-hours, Roueche says.
One of the central engineering challenges is finding the right balance between strength, efficiency and deployability. The structures must be durable enough for demanding environments without being overbuilt or difficult to transport.
That has required researchers to look beyond simply replacing conventional framing with mass timber. Standard cross-laminated timber (CLT) may be stronger and thicker than needed for this type of deployable structure, Roueche adds.
“Standard CLT is almost overkill for this application,” Roueche says. “It provides more strength than we need, so part of the challenge is figuring out how to use mass timber more efficiently.”
The team is evaluating designs intended to improve structural performance while also protecting insulation inside the assembly, an important consideration for cold-weather use. Testing in Auburn’s Advanced Structural Engineering Laboratory will help researchers verify the strength, stiffness and overall behavior of those designs.
According to Jake Elbrecht, assistant research professor in the McWhorter School of Building Science, a unique challenge in designing and constructing temporary housing is what happens at its end-of-life: “Air Force operations demand flexibility, and fixed housing impedes future redeployment. Designing temporary housing for disassembly and reuse accelerates redeployment and reduces long-term cost. Investigating structural performance, thermal performance and component reuse together reveals how these priorities compete and are weighed against one another in design decisions.”
Latest News
West Fraser Continues To Grow In The U.S. South And Western Canada
West Fraser continues to grow its lumber business in the U.S. South and in western Canada. The company announced that it has entered into an agreement to acquire the Bibler Brothers Lumber sawmill and lumber…
Canadian Softwood Lumber Exporters To Get Refunds Following Ruling
Canada says it has won an international ruling on export charges levied under the Canada-U.S. softwood lumber agreement. Trade Minister Ed Fast says the London Court of International Arbitration has ruled in favor of the…
Oregon’s Seneca Sawmill Gets National Recognition For Innovation
Seneca Sawmill Company is transforming the way timber companies operate. The Eugene-based company was recently featured in IBM’s national publication, IBM Systems Magazine, for its visionary leadership and use of technology to build a thriving,…
Analysts Confident U.S. Lumber Market Warming Despite Slow Winter
The bitter winter froze homebuilders to start the year, but analysts and lumber producers expect demand to bounce back. Housing starts fell to an annual rate of 907,000 nationwide in February, down two-tenths of a…
Find Us On Social
Newsletter
The monthly Timber Processing Industry Newsletter reaches over 4,000 mill owners and supervisors.
Subscribe/Renew
Timber Processing is delivered 10 times per year to subscribers who represent sawmill ownership, management and supervisory personnel and corporate executives. Subscriptions are FREE to qualified individuals.
Advertise
Complete the online form so we can direct you to the appropriate Sales Representative.